sand mound cleaning and repair Elevated Sand Mound Pressure Dose Systems are installed in locations where the perc rate is between 90 and 120 and where a limiting zone does exist Elevated Sand Mound Pressure Dose Systems are installed above ground including a submersible pump and with D E P approved sand used in the bed